OREANDA-NEWS. For the last three months, Lenenergo has significantly increased the volume of performed works within the frameworks of the repair campaign. Since June till September 2006 the consumption of means increased in 1.5 times as compared to the first half-year.

Expenses for repair of basic funds of OJSC “Lenenergo” made 283 million roubles for nine months of this year.

Also, for nine months of this year, 3 090 cable lines of 0,4-6 (10) KV were repaired, or 152% to planned parameter. Besides, the repair of 13 high-voltage cable lines of 35-110KV was carried out.

907 hectares were cleared lengthwise the distribution networks and 1 142 hectares lengthwise the high-voltage lines. Over 23 thousand trees were cut.

Till November 15, OJSC “Lenenergo” should get a passport of readiness for the winter period, which is a confirmation of technical and qualification readiness of the company for work in the winter period.