OREANDA-NEWS. Members of the Commission of OJSC “RAO “UES of Russia” have examined readiness of OJSC “WGC-5” to work in autumn-winter period of 2006-2007 according to requirements of the "Regulations about estimation of readiness of electric and heat supply organizations to work in autumn- winter period".

The commission has confirmed performance of all basic and additional conditions specified in the Regulations. By results of examination of OJSC “WGC-5” the Passport of readiness to autumn-winter 2006-2007 period of maximum loadings has been handed over.

For today, industrial branches of OJSC “WGC-5” Konakovskaya, Nevinnomysskaya, Sredneuralskaya and Reftinskaya state district power stations have executed necessary actions on preparation for winter period and are ready to provide reliable generation of thermal and electric energy.