OREANDA-NEWS. June 25, 2012. The works on wiring of electric equipment and electric lighting of reinforcement production shop of TITANSTROIMONTAZH CJSC are accomplished by the third workshop specialists of one of the leading companies of the Holding –Sosnovoborelectromontazh OJSC.

The total sum of the performed works amounted to about 13 million roubles. The production should satisfy requirements for the metalware of all organizations of TITAN-2 Holding, participating in the construction of Baltic NPP. The shop is planned to make 30 tons of reinforcement a day after full commissioning.

Another considerable milestone on Baltic NPP has become the fulfillment of the main bulk of electrical installation works on laying of lightning protection grid on all buildings of Power Unit No.1 being under construction. All these works will be completely finished after the buildings come to zero level. Here the construction electricians have to fulfill works for the sum of over 7 million roubles.

TITAN-2 is one of the first building organizations, which has come to the construction site of Baltic NPP. The Holding organizations performed all works on vertical planning of the area, they arranged utility water supply on the construction site, and placed the first concrete in the reactor building of Power Unit No.1. All these have marked the beginning of the main period of works in construction of the nuclear power plant.

The project of Baltic NPP means the construction of two Power Units with the reactor of WWER type, with electrical capacity of 1,150 MW and heating capacity of 250 Gcal/h each. The first Power Unit is supposed to be commissioned in 2016, the second one – in 2018. Power Plant location is the north-east of Kaliningrad region, about 15 km from the town of Neman. The construction management company of Baltic NPP is Concern Rosenergoatom OJSC. General Contractor is NIAEP OJSC.

Sosnovoborelectromontazh OJSC, entering TITAN-2 Holding, have been successfully performing all sorts of electrical installation works for more than 40 years, developing the design, construction and industrial-technological documentation. Specialists of SEM OJSC have performed all electrical installation works within the frames of construction of the first stage of South-West Central Heating and Power Plant. Today they are finalizing works on installation of equipment of 110/6kV ПC-58A in substation, which should supply with the electric power the major objects of B.P.Konstantinov Petersburg Institute of Nuclear Physics.