OREANDA-NEWS. On March 24 the Privolzhsky Administration of Rostechnadzor issued to OAO "TANECO" a certificate of compliance with the technical regulations and project documentation for a number of completed projects of Phase 1B of the Refinery and Petrochemical Plants Complex.

The document confirms that the main facilities of the combined hydrocracking installation comply with the technical regulations (norms and rules), as well as with other regulatory documents and project documentation.

The design capacity of the combined hydrocracking installation by the raw material mixture amounts to 2.9 million tons per year. The installation allows increasing the yield of light petroleum products, getting high quality marketable products and starting production of the European level motor fuels.

The plans provide for production of up to 1 million 200 thousand tons of Euro-5 diesel fuel, Jet brand aviation kerosene and hydrotreated heavy gas oil. The installation commissioning ensures strengthening the competitive position of the Russian products at the domestic and foreign markets, decrease in exports of oil stock and increasing the output of high added value products.