OREANDA-NEWS. On 03 September 2008 was announced, that on the 31 August - 1 September 2008 night at 24:00 according to requirements of the Federal law as of 26.03.2003 No.35-FL "On electric power industry" and the joint order of SO UES, JSC and Irkutskenergo, JSC as of 20.02.2008 No.50/67 "On adoption of the plan of the schedule of joint actions on the organization of SO IES, JSC branch in Irkutsk, delegation of functions of operational dispatch management by the grid mode of the Unified Energy System of Russia on the territory of the Irkutsk region to the branch of System Operator of Unified Energy System Irkutsk Regional Dispatch Management from Irkutsk Grid Company Ltd. took place. The certificate of delegation was signed by Director for Energy Manufacture - Chief Engineer of Irkutskenergo Evgeniy Novikov, Deputy General Director of Operational Dispatch Administration of Siberia branch of SO - CDA UES, JSC Alexander Rabotin, Director for the Regional Dispatch Administration of Irkutsk region Leonid Gorbunov, First Deputy - Main Dispatcher of the Regional Dispatch Administration of the Irkutsk region Igor Matskov, Director of Irkutsk Grid Company Ltd. Boris Karatayev. Also Deputy Director for Dispatch Management Technologies Development of SO UES, JSC Yury Vishnevsky, and Deputy Chief of Main Administration of the Ministry of Emergency Measures in the Irkutsk region Mikhail Begun were present at signing the document.