OREANDA-NEWS. July 16, 2010. “EMAlliance –Finance” (a part of “EMAlliance” Group) paid coupon yield for the 8th coupon of the bond loan. The payment was executed by ZAO “UniCredit Bank” which is LLC “EMAlliance -Finance” paying agent.

LLC “EMAlliance -Finance” first bond loan was placed July 14th 2006 for 5-year period. The bonds total nominal price is 2 bln. rbl. (2 bln. bonds with 1000 rbl. value for each). Semiannual interest coupon is paid for bonds. The interest rate of 18 % per annum for the 8th coupon was set in June, 2009. Thus, the total yield for the 8th coupon paid by LLC “EMAlliance -Finance” July 9th , 2010 amounts to 179,50 mln. rbl. (89,75 rbl. for one bond).

JSC “Energomashinostroitelny Alliance” (EMalliance) is one of the leaders of domestic power machine-building industry, having international experience and competence in designing, fabrication and complete supply of “boiler islands” for TPP, including EPC-contracts. “EMAlliance” possesses more than 70,83% of common shares of Plant “Krasny Kotelschik”. EMA’s engineering branches are located in Taganrog, Podolsk, Barnaul and Ivanovo. Enterprise personnel is 6000 employees, among them 700 highly qualified designers. The present day the company is able to design boilers with steam generation from 100 to 4000 tones per hour, (inc. for the equipment with to-, above-, ultra supercritical steam conditions. EMAlliance possesses the technology of designing and fabrication of HRSG for CCP and performs engineering, complete supply of the equipment for WtE plants and bio fuel processing enterprises and develops new technologies in renewable energy sources, pollution abatement system, coal gasification, SCC.