OREANDA-NEWS. August 14, 2007. Chairman of the Board of Directors of Tuapse export terminal told that the liquefied petroleum gas terminal, which is being constructed in Tuapse, can reach its projected capacity by 2010.

According to Interfax, the capacity of the terminal will reach 1.5 mln t. of liquefied petroleum gas and 2 mln. t. of low-sulfur diesel fuel per year by 2010. It is planned that putting this terminal into operation will help to create international transport liquefied petroleum gas shipment corridor. The cost of the construction of the terminal totals $200 mln.