OREANDA-NEWS. January 21, 2007. CJSC Engels Pipe Plant (Saratov region, part of ESTAR Group) increased its output by 12%, or up to 71.7 thousand tons of finished products, in 2007 vs. 2006, ESTAR Group reports.

In particular, the plant produced 56.8 thousand tons of water and gas pipes last year, which is an 11% increase vs. 2006, and 14.9 thousand tons of shaped tubes, or a 15% increase.

The plant produced 4.2 thousand tons of finished products in December.