OREANDA-NEWS. On 04 August 2008 was announced, that owing to invaluable merits of national leader Heydar Aliyev was possible the formation of independent Azerbaijan power supply system. Growing out in all branches, and also in the sphere of electric power industry reached results are successfully continued by the president of republic Mr. Ilham Aliyev. Directly under his instructions carried out large-scale civil works and numerous actions are directed on improvement of well-being of population have promoted the decision of social problems. New industrial and trading objects are under construction, welfare objects are also being created, that in its turn demands the construction and creation of new power objects. The introduction into work of new power-capacities, has also accelerated social and economic development of northern region - informing on it to press-service of joint-stock company "Azerenerji" director of Khachmaz power net Shalbuz Zakiyev has also told about civil works carried out at 330-KVt substation “Khachmaz”.

Under his message testing of autotransformers, each by capacity of 180 MVA proceeds. At the same time are also established metal-designs of lightning-conductors. Also have been counterbalanced metal designs at 330 and 110-KVt substations. Let us note, that the basis for metal nets of transformers by capacity of 630-KVA is pawned and concreted. Alongside with installation of fire-prevention pumps, condensers and reactors of condenser batteries proceed. Let us remind, that 330-KVt substation will be fed from electric main "Derbend-Yashma", and the introduction of object into will much more raise the power safety of operation of the region.