OREANDA-NEWS. On 11 August 2008 was announced, that according to July results, generation branches of OJSC “TGC-9” being the part of “Integrated Energy Systems” Holding produced 1.04 billion kW/hr electricity, which is 139 million kW/hr (15%) more than in July 2007. For the last month Company’s power stations in Perm Region generated 471.1 million kW/hr electricity, in Sverdlovsk Region – 365.7 million kW/hr, in Komi Republic – 198.5 million kW/hr. Substantial growth of electricity output became possible due to construction and putting into operation new generating facilities. A new turbo unit was launched at Permskaya HPP-14 on July 8, 2008.

Heat output of TGC-9 power stations and boiler houses made 1.5 million gKal in July which is 29.4 thousand gKal (2%) more than the showings of the same period of 2007. TGC-9 generating branches produced 510.8 thousand gKal of heat in Perm Region, 911.6 thousand gKal – in Sverdlovsk Region, 41.8 thousand gKal – in Komi Republic. Growth of heat output was caused by connection of new large industrial consumers to the TGC-9 heat sources. In particular “Uralorgsintez” became a steam consumer of Tchaikovskaya HPP-18.