OREANDA-NEWS  On 17 September was announced, that ground works for the warehouse building were completed. The General Contractor has already performed 70% of piling, installation of solid columns and roof frameworks for the warehouse building and now the excavation works for the stand-alone office building are in progress. The Project completion is scheduled for the 3Q 2009.

“Alacor Business Park City” is a project which consists of two dominants: office center class В (38,000 m²) and warehouse premises class A (19,500 m²) to be built on the plot of 5.59 ha on the crossroads of Stolichnoye Highway and the Ring Road. This area has an excellent accessibility being connected to the CBD via Stolichnoye Highway, left bank of Kiev and Boryspil airport by three bridges. It is also located near a major international motorway junction, where the E95 and E40 motorways meet. The nearest underground station “Vydubychi” is situated only a 3-minute drive from the site.

The office center is a 15-story tower, with a full infrastructure which includes a fitness center, beauty salon, café, restaurant, pharmacy, bank, conference halls and underground parking which enables employees to embrace a modern lifestyle which combines work and leisure. Premises will be let to Tenants on a conditions of “shell and core” with an open space layout. The project will be supervised by a professional management company.

The warehouse premises are designed according to the modern storage conditions with antidust floor coverage and load-bearing capacity of the floor of up to 8 t/m². The clear height of the storage area will be up to 12 m.