OREANDA-NEWS. On 12 February 2009 was announced, that the winner of the contest of the annual reports, which is annually conducted in Khabarovsky krai, and the owner of the First Degree Diploma has became one of the best Russian TGCs – JSC “Far Eastern Generating Company” (JSC “FEGC”)* - its head office, located in Khabarovsk The respective order was signed by the Governor of Khabarovsky krai V. Ishayev.

In this contest there were taken part 19 largest joint stock companies, operating in the territory of Khabarovsky krai. Among the nearest competitors of JSC “FEGC” this time are turned to be the largest aircraft building company JSC “KNAAPO” ((Komsomolsk-on-Amur Aircraft Production Amalgamation) (the Second Degree Diploma) and the only Far Eastern iron-and-steel company JSC “Amurmetall” (The Third Degree Diploma).

Note, that the annual report of JSC “Far Eastern Generating Company” for the year 2007 became the first, published by the energy company, starting its operation on January 1, 2007. It was considered ”The Best Debut” at the 11th Annual Contest of the Annual Reports, arranged by JSC “Stock Exchange RTS”. Its results were published in November of the last year.

As it was already informed, the annual report for 2007 the JSC “FEGC” has performed in the form of utility device manual. Serious information in this report-“manual” is presented very visually and has counted upon the very wide circle of readers.

Besides that, the comprehensive annual report is added by three small special brochures. In one of them is briefly and capaciously narrated about the structure, activity and prospective plans of the generating company, in other – about the most important investment projects of 2007-2008, the third one – “Wonder-book on energy sector” – in the way of excursion to Khabarovskaya CHPP-3 is narrated about secrets of electric and heat power production.

In the JSC “Far Eastern Generating Company” are considered that non-standard form of presentation of information in the annual report is not only ease its perception, but allow to reflect the events of the first year of operation of JSC “Far Eastern Generating Company” in more comprehensive and transparent way.