Azerenergy Carried Out Repair Work in All Power Objects
OREANDA-NEWS. August 11, 2009. The corresponding measures are carried out in the line of to supply the northern regions of the republic with regular and without break electric power and to eliminate indispositions in the next winter season, reported the press-centre of Azerenergy.
The maintenance repair work is carried out in Khachmaz Power Plant which plays the main role in power supply of above mentioned regions. It was noted in the information given by the power plant to the Press-service of Azerenergy JSC. Lets` note that, different setting measures are carried out for this reason during the last quarter.
According to the information given by the power object, the repair of the equipments and beside it, fire protection system is in the center of the attention. So, checking up of thermal isolation of fire extinguisher water pipes, check up and repair of water pipe isolation of administrative building, repair of opened iron isolation boards in burnt gas exhaust stack are intended.
Construction of addition heater, reconstruction of heater equipment for heating natural gas in the frosty days in the plant are included to the IV quartet of the current year.
Комментарии