OREANDA-NEWS. October 1, 2009. Just before the celebrations of the oil and gas industry workers day the General Director of JSC “Zarubezhneft” N.G. Brunich, his Deputies A.L. Garibyan, Y.L. Smirnov and the General Director of “Rusvietpetro” V.A. Klinchev, First Deputy General Director of the company Cao Mih Loi made a business trip to the North-Hosedayuskoe oil field of the Central Khoreyver Uplift (CKU) in the Nenets Autonomous Area that has been developed by “JC Rusvietpetro”.

As it was reported before the Russian-Vietnamese Joint Company “Rusvietpetro” is developing four Blocks in CKU in the Nenets Autonomous Area and the North-Hosedayuskoe oil field is an important part of the operating process of the company. During the last 8 month according to the schedule a large scope of work has been done.

The top-managers of JSC “Zarubezhneft” and “JC Rusvietpetro” visited the main objects of the oil field, particularly the central custody transfer facility, examined fuel-filling park, energy complex, temporary field camp with modern production facilities and accommodations.

Short but substantial meetings were held with the experts of “JC Rusvietpetro” and the contractor organization “RN-Burenie” at well pads production areas №1 and №2. During exchange of views the oilmen told the heads of the companies of the principle stages of the operation and further plans. At the present moment at the well pad №1 the first production well was drilled and prepared for work. It is planned to drill six more wells. At the well pad №2 the drilling of the first well has also been finished and is being tied in. In total it will be constructed 7 wells: one of them will be exploratory well, the other six – production ones.

The General Director of JSC “Zarubezhneft” N.G. Brunich thanked the teams for the well-coordinated work, wished them further operating success and congratulated everybody who was working that day at the objects with the coming professional holyday.

During examination of the facilities the top-managers of “Zarubezhneft” noted good quality of the roads backfilled between the operational areas. It was proved to be an important fact that in the very short period a bridge with a capacity of 80 tons was build.

Finishing the visit the guests took part in the opening ceremony of a modern rotational housing complex. The symbolic ribbon was cut by N.G. Brunich, V.A. Klinchev and Cao Mih Loi.

Double-stored building provides offices, fine living rooms for experts and workers (80 sleeping accommodations), shower rooms, sauna, up-to-date dinning-room (40 seats) and also a range of amenity and back rooms. The complex is equipped with the newest water and sanitary waste purification systems. The last fact is particularly important from the point of view of maintaining the ecological well-being in the oil field, as it was underlined during the examination of the building.

Summing up the results of the trip the top-managers of “Zarubezhneft” expressed unanimous satisfaction with the progress in the North-Hosedayuskoe field underlining that the works are conducted with strict abidance of environmental protection measures. It means that the operating company fulfils its obligations as for the region in the sphere of ecology.