OREANDA-NEWS. March 30, 2010. In 2009, the Customer Service Centers of "Interregional Distribution Grid Company of Volga", Joint-Stock Company situated in the Samara, Saratov, Ulyanovsk, Orenburg and Penza Regions and the Republics of Mordovia and Chuvashia accepted 11,534 technological connection orders. The capacity requested by consumers totaled 1,566.3 MW.

According to the year's results, IDGC of Volga, JSC made with consumers 10,020 contracts for the maximum consumption capacity 267.5 MW and carried out 6,114 technological connections with the maximum capacity 178.8 MW.