OREANDA-NEWS. September 28, 2010. “Oil Rocks” Offshore Drilling Office of the Complex Drilling Works Trust started drilling of the well No 2521 from the platform of the same number. The project depth of the well drilled to Gala-2 Suite makes 1490 meters.

The drilling works at the well No 2521 are planned be completed on November, 2010. In total, 12 wells are expected to be drilled from the platform No 2521.