OREANDA-NEWS. October 15, 2010. The commissions for valuation of preparedness for operation during the autumn and winter period 2010/2011 have been appointed. The respective order "On Inspection of Preparedness of IDGC of North-West's Branches for the Work during the Autumn and Winter Period 2010-2011" has been signed by the company's General Director Alexander Kukhmay.

The commissions for inspection of preparedness of industrial divisions for operation during the autumn and winter period have already completed their work in the branches. Now the commissions of IDGC of North-West for inspection of preparedness of the company's branches start their work.

Arkhenergo  11-15 October   
Vologdaenergo 18-22 October   
Karelenergo  11-15 October   
Kolenergo  18-22 October   
Komienergo  11-15 October   

Novgorodenergo  18-22 October   
Pskovenergo  11-15 October   

Chief Engineers of IDGC of North-West’s branches were appointed to the positions of deputies chairpersons of the commissions.

The commissions will value the condition of electric grid objects, performance of the preventive maintenance schedules, level of equipping and level of provision of the personnel with the necessary protection devices, presence of the emergency stock of equipment and materials.

Based on the results of the checks, the decision on presenting IDGC of North-West's branches with certificates of preparedness for the forthcoming autumn and winter period will be passed.