OREANDA-NEWS. March 09, 2011. Hyundai and Skoda trains new and two train cars with the locomotive thrust "Ukraine-2" manufactured by Kryukivsky Car Factory that will be supplied to South Rail Road in frame of preparation for Euro 2012, will be maintained at repair depot of Kharkov station, which last year had major repairs.

In 2010, the rail car depot in Kharkiv has the upgraded roof lamp of the house with the installation of overlapping opaque and translucent profiled sheet, exhaust system new deflectors were installed, blast cleaning and painting metal roofing bearing was performed, ceiling and upper walls painting was done, lighting on the ceiling was completely replaced. After the reconstruction of the lamp, the load on trusses and foundation was reduced by 25%.

This year, depot building repair and reconstruction will continue. In the updated depot, three-level platforms will be arranged to maintain service wagons, platforms to maintain rooftops ACs.
Equipment will be installed to replace the wheel set without disconnection and jacking the cars, and also to dismantle block conditioners.