First Intrarussian Offshore Gas Pipeline Put into Operation
OREANDA-NEWS. June 15, 2011. The first intrarussian offshore gas pipeline Dzhubga–Lazarevskoye–Sochi was put into operation in
The gas pipeline's length is
All the pipes for the gas pipeline were made by Vyksa Steel Works (VSW, Nizhni Novgorod Region), part of United Metallurgical Company (OMK). They can withstand pressures up to 9.8 MPa. All in all, 49,951 tonnes of pipes were supplied for the construction of the Dzhubga–Lazarevskoye–Sochi gas pipeline. "At present, owing to the investment in the renovation of pipe facilities, our Company can produce pipes at any complexity level, including pipes for such subsea gas pipelines as Dzhubga–Lazarevskoye–Sochi. All the pipes underwent obligatory certification and have unique characteristics. This is not our first experience in the production of pipes designed for subsea gas pipelines. OMK supplied its pipes for the
Комментарии