OREANDA-NEWS. August 18, 2011. On the results of the first quarter of the year 2011 PJSC TKZ “Krasny Kotelshchik” (which is the main production assets of PJSC “EMAlliance”) has increased the finished products shipment more than 2 times (by 7.1 thousand tons) as compared to the same period of the year 2010. Value of the products shipped exceeded 2 milliard Rubles.

Total weight of the equipment shipped in the first quarter 2011 made 13.2 thousand tons. That value includes 890.5 tons to the amount of 290 mln. Rubles shipped to CIS and overseas countries.

The main consignees of the finished products during the period included: Nyaganskaya GRES; Urengoiskaya GRES, Cherepetskaya GRES, RN-Tuapsinskiy NPZ, PJSC Irkutskenergo CHP-9; CHP-10; CHP-11; Novocherkasskaya GRES, Gusinoozerskaya GRES, Lukomlskaya GRES, Moldavskaya GRES; Zarubezhenergostroy (for TPS Tishrin) and other projects.

The following equipment is worth being emphasized among large-sized range of the above shipments: inlet and main gas ducts for Nyaganskaya GRES and Urengoiskaya GRES; Modules 1, 2, 3, 5, 6, 7 (each Module consists of four Units) of the first HRSG for Nyaganskaya GRES; Stack Structural Steelwork, Stack Structures and HRSG stack itself for RN-Tuapsinskiy NPZ; Modules 1, 2, 3, 4, 5 (each Module consists of three Units) of 1st, 2nd HRSG for Urengoiskaya GRES; Structural Steelworks of 2nd Boiler for Cherepetskaya GRES; Platen Superheater for TPS Tishrin (Syria); HP Heater for Gusinoozerskaya GRES.

At present the finished products shipment continues within the scope of fulfillment of orders for Nyaganskaya GRES, Cherepetskaya GRES, Urengoiskaya GRES, as well as for some Ukranian Stations: Staro-Beshevskaya TPS, Kurakhovskaya TPS. In the near future, it is planned to start the shipment of equipment for Zaporozhskaya TPS.