OREANDA-NEWS. March 07, 2012. Through a portable equipment and computer is linked together, can determine compressed natural gas volume. A few days ago, ningbo measuring and testing institute declare compressed natural gas (CNG) and angry machine metrological verification project successfully passed the examination, this equipment in the first set of zhejiang province as with angry machine verification device.

For promoting energy conservation and pollution reduction efforts to optimize energy consumption structure and improve the urban environmental quality, speed up the construction of ecological civilization, the city's downtown advancement will buses, taxis, port container trucks to switch to natural gas, with matching the city of compressed natural gas station construction are also advancing. How to avoid natural gas "doesn't, to ensure that the owner legitimate rights and interests, and the measurement by introducing the institute equipment, technology research and personnel training, and lust for compressed natural gas and angry machine in conducting metrological verification ability.

It is reported, the next step, qualitative inspect branch will use the device to compressed natural gas and angry machine according to law carry out compulsory verification, for ningbo motor vehicle "from oil to gas" project to provide measurement technical support.