OREANDA-NEWS. July 13, 2012. The program is intended for the period from 2012 to 2015 and covers all voltage transmission lines located within the area of all operating divisions of the branch.

Karelenergo is implementing the special program to bring 0.4–150 kV overhead line segments crossing roads, railways, and rivers into compliance with regulations and specifications. The program is intended for the period from 2012 to 2015 and covers all voltage transmission lines located within the area of all operating divisions of the branch. The facilities are transmission lines crossing different roads 22 times, rivers – 26 times, railways – 8 times, trolleybus routes – 5 times.