OREANDA-NEWS. August 09, 2012. In the first six months of 2012 IDGC of the North-West, JSC executed 6,186 contracts for performance of technological connection with a total capacity of 106.2 MW which includes 5,899 contracts for performance of technological connection of applicants’ power units with capacity up to 15 kW, total capacity amounting to 57.8 MW., reported the press-centre of IDGC of North-West.

As compared to the same period of the previous year, the number of executed technological connection contracts has increased by 1,944 items (+45.8%). Capacity connected has grown by 39.1 MW (+58.3%).

In H1 2012 the quantity of contracts for performance of technological of applicants’ power units with capacity up to 15 kW exceeded the performance recorded in the same period of 2011 by 1,857 items (21.1 MW). Additionally, one has performed technological connection of the 110 kV combined cycle plant of Vologda CHP with total capacity equal to 110 MW.

Proceeds from technological connection in H1 2012 made 499.9 mln. RUR (VAT excluded) while in the same period of the previous year it was 401.1 mln. RUR (VAT excluded).