OREANDA-NEWS. August 15, 2012. In 2018 the maximum load within the territory of IDGC of the North-West, JSC presence is expected to make 7.261 GW. In 2010 the energy consumption level was 6.094 GW, last year is amounted to 6.16 GW, reported the press-centre of IDGC of North-West.

In 2012 the maximum load is expected to be 6.494 GW, growth thus amounting to 5.4%.

Main consumers of IDGC of the North-West are industrial enterprises (51%). A considerable part (31%) falls to the share of electric energy supply at the boundaries of balance inventory of territorial grid organizations (TGOs).

Other consumers account for a portion in the total structure varying from 7% (population) to 3-4% (transport, budget consumers). The lowest percentage of energy consumption (1%) falls to the share of agriculture.