OREANDA-NEWS. August 27, 2012. The start-up works have been performed by the personnel of TITANENERGONALADKA, JSC in reactor and turbine houses, as well as on unit-connected and power transformers of the fourth power unit of Kalinin nuclear power plant.

The Holding specialists performed the following kinds of work:

• Development of methodologies for start-up works and testing automated process control systems and subsystems;

• Adjustment of measurement channels for the system of monitoring and control of the normal operation equipment in reactor and turbine houses;

• Adjustment and testing of 750kV-power electric equipment along with commissioning power unit No.4;

• Adjustment of protective and automated devices for 750kV-equipment with commissioning of power unit No.4.

TITAN-2 Holding is the largest Group of Companies in the North-West of Russia which erects the most important facilities of nuclear industry and power engineering. Its organizations perform the full cycle of building and assembly works, from development of design documentation to the facility commissioning. The Holding consists of about 20 organizations and employs about 4,000 employees with more than 40-year-experience in construction of unique and super-complicated facilities. The Holding’s management company and the leading engineering business-unit is the Company JSC CONCERN TITAN-2

TITANENERGONALADKA, JSC is a subsidiary of TITAN-2 Holding. The organization performs startup works during preparation and carrying out individual tests, integrated testing of equipment in the facility's process system, electro-technical and other devices, systems of protection and automation.