OREANDA-NEWS. September 27, 2012. The consumers of electric power, who hadn’t concluded a respective power supply contract, paid over RUR 200 mln. to MOESK. By the inspections’ results, held in the framework of action “Honest kilowatt”, more than 49,6 mln kWh of electric power have been returned in the productive supply for 8 months of 2012 – this volume is sufficient enough for power supply of Kolomna which is in Moscow region, during a month. Totally from the beginning of 2012 the power engineers of JSC “MOESK” made 4,683 raids on the facts revelation of non-accounted electric power consumption, reported the press-centre of MOESK.

List of the legal persons, connected to the electric grids of JSC “MOESK” with a violation of the established order for the technological connection and consuming electric power without a respective contract conclusion of power supply, has been headed by the large construction companies. After an inspection they paid fully the indebtedness before the power engineers in the amount of RUR 3,8 mln.

Permanent, methodical work on the cases revelation of electric power thievery in the framework of action “Honest kilowatt” is carried out to increase the quality and reliability of the consumers’ power supply.