OREANDA-NEWS. November 21, 2012. The Certificate of Organization's Managerial And Engineering Readiness for work performance at the sites of Gazprom Joint Stock Company has been issued to the leading electrical installation organization of the Holding, OJSC Sosnovoborelektromontazh.

GAZPROM GAZNADZOR, LLC is an expert in evaluation of managerial and engineering readiness of organizations for carrying out capital construction, repair and reconstruction work at Gazprom sites.

Within the frameworks of the Certificate obtained, OJSC Sosnovoborelektromontazh got admission to the following types of work:

• Assembly and setting up of utility systems and protection, automation and control equipment, security systems of gas facilities, and instrumentation;

• Installation and start-up of electric equipment and power supply in capital construction and reconstruction of Gazprom's gas transfer facilities.

Thus, the Holding proved its technical competence in performance of these kinds of work while reconstructing and constructing the Gazprom sites.

Currently, TITAN-2 is shipping electric installation materials to the gas-turbine station of Novy Urengoy Gas and Chemical Complex (GCC ). In accordance with the contract, the holding's electrical assembly organization will install the process control systems, instrumentation and automation systems, as well as the systems of impulse pipes and instrumentation data transmitters. Along with the process control system equipment installation, electricians are to install several thousand sensors, devices, and to lay about 500 kilometres of cable and 20 kilometres of impulse pipes.