OREANDA-NEWS. E4-Sibkotes (comprised by JSC “E4 Group”) received a positive conclusion of the Main State Expert Review Board of Russia on the project of construction of Abakanskaya TPP, the Customer is JSC “Eniseyskaya TGK (TGK-13)”.

In accordance with the documentation elaborated by the company`s specialists, in the capital of the Republic of Khakasia a 125 MW power unit is being erected. It will include turbine T-125/136-12.8-8MO produced by JSC “Uralskiy Turbine Factory”, turbine generator set TVF-125-2UZ manufactured by JSC “ELSIB” and steam boiler E-500-13,8-560BT by JSC ”Sibenergomash”. All the equipment is distinguished by high reliability and ensures reduction of specific emissions of pollutants. Under the project of E4-SibKOTES, it is planned to construct buildings for grouped switchboards, an engine house and a circulation pumping station.

It is important to note that the new power unit will be the first one in Russia to employ Clyde Bergemann dry pneumatic ash and slag removal system. The up-to-date equipment has a number of features which allow reducing essentially the costs for the construction of the dry pneumatic ash and slag removal system, as well as storing ash and slags efficiently (space reduction up to 1.4 times). The application of such a technology will decrease the impact upon the region environment.