OREANDA-NEWS. GTU-4P gas turbine plant №33-08 manufactured by OJSC "Perm Engine Company" and operating at OJSC "Surgutneftegas" as part of power station at Kontilorskoye field has run more than 80 thousand 800 hours and is ready to be sent for overhaul. During time of operation on site leader gas turbine plant has been under overhaul only twice, each time it was carried out after 26-27 thousand hours (guaranteed life makes up 8 thousand hours and assigned life - 25 thousand hours). Operating time of one more GTU-4P gas turbine plant №33-06 located at the same field makes up 79 thousand 780 hours as yet, and the plant is still in operation. These are the record results among home-produced gas turbine plants and they are declarative of the high quality production of these plants at Perm Engine Company.

In total Perm Engine Company has produced and delivered to the customers 670 gas turbine plants, being the leader of Russian gas turbine plant market in the recent five years. Every year PMZ receives orders for the production of 50-60 gas turbine plants and the same quantity for carrying out overhaul. Perm gas turbine plants enable customers to solve a number of vital tasks: utilization of oil-associated gas, considerable reduction of energy sources cost, reduction of environmental stress.