OREANDA-NEWS. JSC "KazTransOil" announces preliminary operation and financial-economic results for the first half-year of 2013.

"KazTransOil" JSC (non-consolidated) volume of oil transportation equaled to 26,198 thousand tons, which is 2% higher than the plan and 1% less than similar indicator for the first half-year of 2012.

Consolidated volume of oil and petroleum products transportation and transshipment was 32,681 thousand tons, which is 3% higher than the plan and 2% higher than similar indicator of the first half of 2012.

"KazTransOil" JSC (non-consolidated) oil turnover was 18,334 million tons per kilometer, which is 12% higher than the plan and 10% higher than similar indicator for first half of 2012.

Consolidated oil turnover amounted to 22,510 million tons per kilometer, which is 10% higher than the plan and 11% higher than a similar indicator for the first half of 2012.

"KazTransOil" JSC supplies of the Volga fresh water to consumers in Atyrau and Mangistau regions of Kazakhstan via Astrakhan-Mangyshlak water pipeline for the reporting period made 11,237 thousand cubic meters, which is 9% higher than the plan and 2% higher than similar indicator for first half of 2012.

Non-consolidated income for the first half of 2013 amounted to KZT 82,375 million, which is 10% higher than the plan and 44% higher than similar indicator for the first half of 2012.

Non-consolidated net income was KZT 33,757 million, which is 62% higher than the plan and 155% higher than the result for the first half of 2012.

Consolidated financial results for the first half of 2013 will be announced within the terms, established by legislation.