OREANDA-NEWS. The Trubodetal Plant (Chelyabinsk, a part of United Metallurgical Company, CJSC OMK) has shipped mounting units for the Bubnovka compressor station. Under the Gazprom order, the plant produced 299 units. They will be used for reconstructing the Bubnovka compressor station, located on the Petrovsk-Pisarevka section, through which gas will be transported by the “Southern Corridor” gas pipeline.

One of the terms stipulated by Gazprom is that the manufacturing and delivering of the products happen as soon as possible. For this technologically intensive gas pipeline facility, the Trubodetal Plant has produced mounting units and made access hatches in them for the first time; manufacturing of access hatches was mastered at the plant in 2012.

“It can be said without any exaggeration that the order for the Bubnovka compressor station is one of the most important for our company. It is the first contract for the delivery of component parts for Gazprom's strategic facility, and we have successfully fulfilled all contractual provisions. I think this proves that the plant is ready to further participate in the construction of the “Southern Corridor” gas pipeline,” said Managing Director at Trubodetal Igor Voronin.