OREANDA-NEWS. Alderley FZE announces the successful delivery of a crude oil bi-direction prover and analysers for the Gazprom Neft (Gazprom) Badra Oilfield Development Phase II Project in Wasit province, Iraq.

The scope covers the sales contract for oil fiscal measurement using a bi-directional prover with inlet/outlet 10" 600#, 16" prover loop. The system includes an inbuilt proving tank for in-house calibration. The crude oil quality measurement unit comes complete with a H2S Analyser, Reid Vapor Pressure (RVP) Analyser, Pour Point Analyser and a Salt in Crude Analyser.

Adrian Philips, Managing Director at Alderley FZE comments, "This is the second contract we have supplied for the Badra Oil Field, both measuring the fiscal transfer of oil. We are proud to be working again with Gazprom in Iraq."