OREANDA-NEWS. The Board of Directors of OJSC “Lenenergo” has approved the corrected investment program of Lenenergo for 2006.

The general volume of investments is increased by 781,7 million roubles up to 5 792,5 million roubles without taking into account VAT. The most part of these means will be directed on reconstruction and modernisation of the equipment within the frameworks of preparation for the winter period.

Members of the Board of directors also have heard the report of general director of Lenenergo on preparation for work during the autumn-winter period 2006/2007. Charges on repair of fixed capital for eight months of 2006 have made 215,7 million roubles, including 1 million roubles on materials for increasing an emergency stock.