OREANDA-NEWS. March 22, 2007. The capacity of the 1st unit has been reduced to 50%, reported the press-centre of  Rosenergoatom.
No safety limits have been exceeded.

Presently the plant has four operative units working at a total capacity o 1325 MW.

The radiation background at the plant and in the nearby area is within norm.