OREANDA-NEWS. On 01 July 2008 was announced, that Vyksa Steel Works (VSW), part of United Metallurgical Company (OMK), has reported its operating results for May and the five months of 2008.

VSW produced 119,238 tonnes of pipes of various grades in May and 618,515 tonnes from the beginning of the year.

VSW manufactured 48,282 tonnes of large-diameter pipes (LDP) in May. LDP output in January–May was 298,817 tonnes.

The VSW Wheel Rolling Facility produced 70,706 railroad wheels. The total output for the first five months of 2008 reached 355,014 wheels.