OREANDA-NEWS. April 11, 2012. On April 9, Anatoly Kaigorodov's team at Terminal 3 (managed by Alexander Ivanovich Golubev) of Mine №7 supervised by Kotinskoye mine administration (with Alexander Nikolayevich Mashnyuk as its director) produced the millionth tonne of coal since the beginning of the year.

This is the third mining team in SUEK-Kuzbass achieving such a high result.

All coal was extracted from longwall No. 52-08, which the team mines using DBT equipment and SL 500 shearer.

Synergic and highly skilled team working at the terminal outstrips the production targets by a wide margin. In April, this longwall deposits mining will come to an end and the equipment will be reinstalled into the next longwall, №52-10, with the coal deposit of 2.2m tonnes.