OREANDA-NEWS. August 15, 2012. 2 mln 120 thousand 627 tons of Azerbaijani oil was transported via BTC main export pipeline in July 2012.

Totally 17 mln 888 thousand 544 tons of oil was transported via this pipeline in the period of January-July 2012. In general, 193 mln 669 thousand 186 tons of oil has been pumped to BTC since the start of pipeline exploitation until August 1, 2012.

In addition, 232 thousand 277 tons of Turkmen oil was pumped via BTC in July 2012.