OREANDA-NEWS. August 28, 2012. By the results of the first half of the year 2012 Krasny Kotelshchik (the main production assets of PJSC EMAlliance that is part of the Power-Engineering Concern Power Machines) has increased shipment of the finished products by 2.5 thou. tons (over 18,8%) compare to the similar period of the year 2011 (13.3 thou. tons).

Cost of the shipped products has exceeded 3.2 bn. Rub. (in 2011 – 2.2 bn. Rub.). Total weight of the shipped equipment in the first half of the year 2012 has amounted to 15.8 thou. tons, including, 4 310 tons to the amount of more than 1 048 mln Rub supplied to the CIS countries and overseas. The main consignees of the finished products over the above period were: Serovskaya GRES, RN-Tuapsinskii NPZ, Omskaya TPP-3, Permskaya TPP-9, Ekibastuzskaya GRES-1, Cherepetskaya GRES, Kurakhovskaya TPP, Starobeshevskaya TPP, Bushtynskaya TPP, Cherepovetskaya GRES, Vladimirskaya TPP-2, Hartha TPS (Iraq), Barh STPP (India).

Among the large range of the delivery products the following equipment should stand out: the Boiler Drum for Cherepetskaya GRES; CSH Assemblies and Platen Superheaters for Ekibastuzskaya GRES-1; HRSG Heating Surface Modules 1,2,3,4,5,6,7 (each of 4 Assemblies) for Serovskaya GRES; the Main HRSG Gas Duct and Stack 60m high (shell segments) for Cherepovetskaya GRES, Heating Surface Modules 1,2,3,4,5 and Stack 90m high (shell segments) for Permskaya TPP-9; Modernization Parts and Assemblies for Bushtynskaya TPP; LP CSH outlet stage; HP CSH and PSH for Kurakhovskaya TPP; LP CSH 1 stage for Barh STPP. At the present time, shipment of the finished products is continued pursuant to the Contract execution for Cherepovetskaya GRES (HRSG); Vladimirskaya TPP-2 (HRSG); Ekibastuzskaya GRES-1; Hartha TPS; Starobeshevskaya TPP and others.