OREANDA-NEWS. October 16, 2012. 2 autoclaves (116 tons, 15 m long, 3.9 m in diameter) were handled by 2 Gottwald MHCs with lifting capacity of 100 tons and 63 tons respectively at Berth 5 by stages.

At first the autoclaves were unloaded from ship and placed on the quay to be customs cleared. Then after preparation works the heavy lifts were loaded onto specialized railcars destined to one of the gold-mining enterprises.