OREANDA-NEWS. Recently the well #131 drilled from the platform #4 has been put into commission after total overhaul.

The daily output of the well drilled to Fasila Suite makes 35 tons of oil and about 10 000 cubic metres of gas from 3270-3195 metres. The repair works have been conducted by major workover shop of 28 May OGPD.