OREANDA-NEWS. Absheronneft OGPD of Complex Drilling Works Trust has started drilling works at three new wells on Darvin Bankasy field.
The projected depth of the well #672 drilled to Girmaki Suite from the platform # 670 makes 1520 metres, while the projected depths of well #693 drilled to Girmaki Suite from the platform # 620 makes 1320 metres and of the well #835 drilled to Girmaki Alti Suite from the platform # 720 totals 1475 metres. According to the geologists, daily output of the wells is estimated at 5 tons of oil.