OREANDA-NEWS. Belorusneft continues developing of crude operation from tight gas reservoirs.

Another sidetrack was drilled on Rechitskoye deposit well No. 204g based on recommendation of geological survey division of BelNIPIneft R&D institute. The advance of the well equaled 872 m along the target part of Ptych formations of Voronezh horizon with angles of degrees 80-84, at this 810 m of oil-saturated reservoirs were opened up. Final conclusion on potential of the site may be made upon multi-stage fracturing and performance of all the set of planned actions on development.

Looking back, recently drill well No. 310g Rechitskaya in tight gas reservoir of Petrikovskiy horizon gave commercial oil flow at the rate of 20 t per day.