Power Engineers of Abakan TPP Exceed Electric Generation
OREANDA-NEWS. February 03, 2010. Abakan TPP (a branch of JSC “Yenisei TGC (TGC-13)” summed up the industrial results of 2009. During the crisis year the
The production of the electric power in 2009 accounted for 1,462,578 thousand kWh. Though the previous record achievement of 2008 was not exceeded, this result was the second in accordance with the amount since the moment of Abakan TPP putting into operation.
High level of the readiness of the technical personnel promotes the achievement of high industrial results of the station technical personnel readiness and meeting of the agreements of the safety and operation of the equipment. The considerable part of the success is the quality and timeliness of carrying out of the repair works during the preparation to the heating season. Past year Abakan TPP carried out the capital construction of turbo-generator of TPF-110/120-130 with the restoration of rotor of the medium pressure in the factory conditions and the installation of the boilers of PSV-
Комментарии