OREANDA-NEWS. August 23, 2010.  The Central Bank of Azerbaijan (CBA) announced  next selection  of contractors by  quotation method.

According to CBA, choice is carried out  by three lots: assemblage of autonomous power supply in treasuries  №№ 1 and 2; construction-assembly work  in these treasuries; installation of  Internet in the Centralized Loan  Register and treasury №2.

Cost of participation in selection makes on AZN 30 for  each lot. The bids are received  till 18.00 pm,  on 2 September at the central office of the bank. Tender procedure will be held  at 10.00 am,  on 3 September.

Contact person: R. Hajiyev. His phone: 4931122 (additional – 501).